Design procedures of soil nail wall
The global stability of soil nail walls is commonly evaluated using two-dimensional limit equilibrium principles, which are used for conventional slope stability analyses. In practise, different shapes of the failure surface behind the soil nail wall have been considered in various methods to analyze the global stability of soil nail walls. Some of these shapes of the failure surfaces include: (1) planar , (2) bi-linear with a two-wedge slipping mass (e.g., German method as in Caltrans, 1991), (3) parabolic , (4) log spiral , and (5) circular . Numerical comparisons among different methods show that differences in the geometry of...
Design on soil-nailing wall Supporting of Foundation Pit in Bao Tou
Project Summary Proposed site is located in the north of the west of the east river road at bao tou . The side of the building has leisure square and commercial shop and underground garage on the north and south of village .The excavation depth is11 meters . Engineering geology According to the geological survey report, the soil is divided into miscellaneous fill,collapsible loess, silt, coarse sand. The physical and mechanical indexes of soil are shown in table 1. Table 1 Physical and mechanical properties of soils Layer soil type name Layer thickness(m) Severe(kN/m3) cohesive force(kPa) Angle of internal friction(°)...
Hampton Roads Bridge-Tunnel
The Hampton Roads Bridge-Tunnel (HRBT) is a 3.5-mile (5.6 km)-long Hampton Roads crossing for Interstate 64 and U.S. Route 60. It is a four-lane facility comprising bridges, trestles, man-made islands, and tunnels under the main shipping channels for Hampton Roads harbor in the southeastern portion of Virginia in the United States. It connects the historic Phoebus area of the independent city of Hampton near Fort Monroe on the Virginia Peninsula with Willoughby Spit in the city of Norfolk in South Hampton Roads, and is part of the Hampton Roads Beltway. To ease the traffic pressure, the expansion of the I-64...
Hollow bar soil nail of Sinorock can meet specific demands
Hollow bar soil nail can be installed in sites with weak rocks, loose soil, weathered layer, sand with stone layer and so difficult to create a hole in complex formation. The unconsolidated ground condition favor the technique of Hollow bar soil nail for fast and simple method of installed compared to the traditional method. For simultaneously drilling and injecting, it is usually performed in cases where the ground needs to be further improved or stabilized during installation. The installation of Hollow bar soil nail is simple and fast, the cost is less, and more important is that the Rock anchor...
Waiting for You at CONEXPO-CON/AGG 2017
On March 6, Sinorock exhibitors have arrived at B92724, Bronze Hall, Las Vegas Convention Center to prepare our booth. All exhibits of Soil nail System have been displayed. From March 7 to 11, Sinorock will show our products at Las Vegas Convention Center. If you have any interest or technical communication, please come to our booth. We are waiting for you. To provide systematic rock anchoring solution for global geotechnical anchoring projects and be the security ground expert, Sinorock is on the way. Trust Sinorock, and you will get satisfactory quality guarantee for engineering.
Best suited conditions for soil nailing
In general, the economical use of soil nailing requires, the ground has to be stand unsupported in a vertical or steeply – sloped cut of 1 to 2 m in height for one to two days. In addition, it is highly desirable that an open drill hole can maintain its stability for at least several hours neither the execution of the work would be more challenging. Geologically the best suited conditions for soil nailing would be characterized as the stiff to hard fine-grained soils which include stiff to hard clays, clayey silts, silty clays, sandy clays, and sandy silts are...
The application and main functions of soil nail wall
Soil nail wall construction is a technique used to bring soil stability in areas where landslides might be a problem. Soil nail can prevent landslides by inserting steel reinforcement bars into the soil and anchoring them to the soil strata. It is called Soil Nail because it’s like having a nail being hammered into the soil, where the nails, are the steel bars. Soil Nail Wall Applications The process of soil nail wall construction has some areas in which is recommended and could provide great benefits, especially when no other option is available. One of the most important things about...
Sinorock, Your Best Choice Among Soil Nail Suppliers
To be perfect soil nail suppliers, product quality is very important, however, it is not the only thing that soil nail suppliers should focus on. The devil’s in the detail. There are lots of soil nail suppliers, Sinorock is just one of them, while, Sinorock is the one who cares details mostly. Details in service Sinorock provides various communication channels for customers with fast response such as Skype, What’s App and E-mail. Skype, What’s App will be 7*24 online. Emails will be replied in 4h. We adheres to the “one-to-one” service strategy. There will always be a certain representative to...
Sinorock® Funny Sports Meeting
On Dec. 31, 2016, the last day for Chinese lunar year of monkey, Luoyang Sinorock Engineering Material Co., Ltd. held a Funny Sports Meeting on the playground outside Luoyang Factory to welcome the coming of 2017. The main sports events are group skipping, shuttlecock kicking, single rope skipping and tug of war. Every staff participated in this activity with full of enthusiasm. Except exercising physical fitness and popularizing healthy lifestyle, it also aims to strengthen enterprise cultural construction, enrich staffs’ sports culture life, enliven sports culture atmosphere and enhance collaboration ability. 2016 is an extraordinary year for Sinorock®: we experienced...
Sinorock® Christmas Activity
On Dec. 25, 2016, Luoyang Sinorock Engineering Material Co., Ltd. held lively Christmas activity at Luoyang Factory, with the theme of Looking for initial dream, embracing most beautiful time——Luoyang Sinorock 2016 Christmas Night. Through games, gratitude link, cards recording harvest in 2016 and plan for 2017 and Santa Claus sending gifts, activity was pushed to a climax. At the same time, Luoyang administrative area was decorated into a completely new outlook with Christmas tree, balloon and colored lamp. Changzhou Factory carried out Christmas activity. Sinorock® aims to provide systematic resolutions for global geotechnical anchorage engineering, gear culture to the international...